Tell your Croydon East MP what you think of East Croydon Station #croydon
More information https://survey.labour.org.uk/eastcroydon
More information https://survey.labour.org.uk/eastcroydon
Croydon Council and Network Rail have signed an agreement to complete the works required before the pedestrian bridge at East Croydon station can be opened to the public from its […]
Only the conditions relating to the provision of kiosk on the bridge were approved for planning application 24/03590/DISC https://publicaccess3.croydon.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=SLP9BYJLJ8R00 1268 people have already signed a petition asking for the gates […]
Petition https://www.change.org/p/ticket-gate-needed-from-cherry-orchard-road-into-east-croydon-station More information https://eastcroydon.org.uk/pedestrian-bridge-at-east-croydon-station/ and https://insidecroydon.com/2025/03/20/network-rails-compromise-too-far-over-bridgetonowhere/
Local MP Natasha Irons has met with Network Rail and been told that the pedestrian bridge over the railway at East Croydon station will be opened by the end of […]
Network Rail are seeking planning permission to open the south side of the pedestrian footbridge over the railway between Cherry Orchard Road (east side) and Dingwall Road (west side). However, […]
Our pedestrian bridge – millions spent – all main parts constructed – and still not open – why? We were relieved to see in April that after a 10 year […]
Representatives of Menta, National Rail & Croydon Council will discuss why the pedestrian bridge across the railway lines is not yet open from the Cherry Orchard Road side. This will be […]